Customer Case Study
Our customer is a leading manufacturer of educational equipment across the UK. They provide educational services with tables, chairs, cabinets and trolleys, all manufactured within the UK.
The original manufacturer of the castors used on their applications was US-based, with long lead times.
Our Challenge
We needed to reduce lead times while sticking to imperial measurements and maintaining all elements of the original design.
Our solution
We held design briefing meetings which allowed us to identify a European castor and design and manufacture an imperial spigot.